Suez EVNA
EVNA, a waste-to-energy plant, asked Cetim to assess the toothed wheel of a steam turbine. The analysis of its remaining useful life confirmed that it could continue to be used while the replacement wheel was being manufactured.
EVNA, a waste-to-energy plant, asked Cetim to assess the toothed wheel of a steam turbine. The analysis of its remaining useful life confirmed that it could continue to be used while the replacement wheel was being manufactured.
With the signature of a multiannual failure analysis contract with Cetim, EDF Ceidre has enhanced its immediate response capability and has embarked upon a long-term partnership.